Delivering Exceptional Results
LOCATION: Aubrey Street, Whangarei
CLIENT: The Salvation Army
Salvation Army Auditorium Building
In 2020, RS Engineering undertook the geotechnical investigation and assessment, civil design, structural design, and construction monitoring for the new Salvation Army Auditorium Building.
LOCATION: Town Basin, Whangarei
CLIENT: Whangarei Arts Museum Trust
Hundertwasser
We bring innovative engineering to life. From pilot projects like Te Kakano (The Seed), shaping techniques for the iconic Hundertwasser building, to delivering complex structural solutions for the Whangārei Art Centre, our team ensures every design is safe, precise, and built to inspire.
LOCATION: Pataua North, Whangarei District
CLIENT: Whangarei District Council
Pataua North Boat Ramp
Investigation, design, consenting and construction monitoring of boat ramp, and revetment structures.
LOCATION: Dargaville, Kaipara District
CLIENT: Northland Regional Council
Kaipara Service Centre
Geotechnical investigation and assessment, civil design and construction monitoring for multi-
LOCATION: Port Road, Whangarei
CLIENT: Whangarei District Council
Bascule Bridge Carpark
Investigation and design of a high profile car park and public space adjacent to the Te Matau A Pohi bridge.
LOCATION: Kerikeri Inlet Road, Kerikeri, Far North District
CLIENT: Private
River Crest Way
Geotechnical investigation and assessment to support resource consent application for a mid-sized residential development, followed by civil design and draughting, project management, and construction monitoring.
LOCATION: Matapouri Road, Tutukaka, Whangarei
CLIENT: Advance Developments Ltd
Admiral Way
Geotechnical investigation, assessment and construction monitoring of a midsized residential development.
LOCATION: AH Reed Memorial Kauri Park, Whareora Road, Whangarei
CLIENT: Whangarei District Council
A H Reed Memorial Park
Project planning, management, and structural design of an award-winning aerial walkway.
LOCATION: Hihiaua Park, Whangarei, Whangarei District
CLIENT: Whangarei District Council
Kotuitui Whitinga Footbridge
Structural design and construction monitoring of iconic award-winning pedestrian footbridge.
LOCATION: Te Rongo Road, Parua Bay, Whangarei
CLIENT: Private
New Dwelling Te Rongo Rd
LOCATION: Breamtail Farms, Mangawhai, Kaipara District
CLIENT: Private
New Dwelling Breamtail
Structural design and construction monitoring of an architecturally designed residential dwelling on a very coastally exposed site.
LOCATION: Adjacent to the Kerikeri Stone Store
CLIENT: Far North District Council
Kerikeri Heritage Foot Bridge
Structural design and construction monitoring of a pedestrian foot bridge over the Waipekakoura River.
LOCATION: Hihiaua Park, Whangarei, Whangarei District
CLIENT: Whangarei District Council
Hihiaua, Waka and Wave
Structural design, project management and construction monitoring of an ambitious sculpture. The Wave and Waka was completed in 2006 and is a blend of natural and engineered materials.
LOCATION: Kaitaia, Far North District
CLIENT: Far North District Council
Kaitaia Reservoir
Structural design and construction monitoring of a new municipal water reservoir, piled and rafted over soft ground.
LOCATION: Waikare Inlet, Opua, Far North District
CLIENT: Far North Holdings
Opua Marina
Project management, consenting, construction monitoring of a 400 berth marina over two stages, including dredging, reclamation, marina construction, and civil works
LOCATION: Waitangi, Bay of Islands, Far North District
CLIENT: Waitangi National Trust
Waitangi Museum
Geotechnical investigation and assessment, fire safety assessment, structural design, and construction monitoring of a new art gallery. RS Eng has also consulted on prior projects including the Gateway buildings and toilet building.
LOCATION: Dargaville, Kaipara District
CLIENT: ARCO Group
Sportsville Dargaville Sports Centre
Structural design and construction monitoring of piles and foundations to new pavilion.
LOCATION: Onerahi, Whangarei
CLIENT: Whangarei District Council
Whangarei Airport
Structural design and construction monitoring of extensions to Whangarei Airport.
LOCATION: Shepherd Road, Kerikeri, Far North District
CLIENT: IES
Kerikeri WWTP
Structural Engineering design and construction monitoring for new Municipal Waste Water Treatment plant, being multiple large tank structures and supporting facilities.
LOCATION: Ruakaka Beach, Ruakaka, Whangarei District
CLIENT: NIWA
NIWA Offices
Geotechnical investigation and assessment, civil design, structural design, and construction monitoring of a commercial office building for the Northland team.
LOCATION: Ruakaka Beach, Ruakaka, Whangarei
CLIENT: NIWA
NIWA Aquaculture Building
Assessment of existing and design of a new building to better suit the high corrosive environment of the aquaculture facility.
LOCATION: Hihiaua Park, Whangarei, Whangarei District
CLIENT: Hihiaua Cultural Centre Trust
Hihiaua Building
Geotechnical investigation and assessment, civil design, fire safety, structural design, and construction monitoring of a commercial office building for the Northland team.
LOCATION: Water Street, Whangarei, Whangarei District
CLIENT: Northland Regional Council
NRC
Detailed seismic assessment of existing building including 3D structural modelling. Structural design of various proposed alterations.
LOCATION: Corner of Cameron and James Street, Whangarei
CLIENT: Private
Cameron James
Detailed seismic assessment of existing building including 3D structural modelling.
LOCATION: Bank Street, Whangarei, Whangarei District
CLIENT: Private
IRD
Fire safety assessment and detailed seismic assessment of existing building including 3D structural modelling
LOCATION: Whangarei
CLIENT: Private
Private Dwelling Building
Structural design and construction monitoring of a high end architecturally designed residential dwelling on a very constrained site.
LOCATION: Laurie Hall Park
CLIENT:
Anzac Memorial
LOCATION: Whangarei Heads Road, Taurikura, Whangarei
CLIENT: Private
Taurikura MBH
Geotechnical investigation of high land instability hazard slopes for a new subdivision.
LOCATION: Paratai Crescent, Woodhill, Whangarei
CLIENT: Private
Paratai Cres Slip Remediation
Geotechnical investigation of a landslide near an existing dwelling, including slope stability analysis and concept optioneering of potential solutions. Design of an anchored timber pole retaining wall to stabilise the land supporting the existing dwelling.
LOCATION: 70 Bank Street, Whangarei
CLIENT: Whangarei District Council
Old Municipal Building
Seismic assessment and strengthening design of the iconic 1912 Municipal Building. Following a fire in 2019, a system of structural steel frames was retrofitted to the existing unreinforced masonry walls to improve the building's seismic rating. A new precast panel building houses a lift and stairs for standalone access to the first storey.
LOCATION: 60 View Road, Hikurangi, Whangarei
CLIENT: Private
View Road Subdivision
Geotechnical investigation of high land instability hazard land for a residential subdivision. Civil design and construction monitoring, plus structural design of residential buildings and construction monitoring.
LOCATION: Sands Road, Glenbervie, Whangarei
CLIENT: Private
Sands Road Subdivision
Geotechnical investigation and flood modelling for a residential subdivision.
LOCATION: Kaitaia
CLIENT: Private
Donald Road Subdivision
Geotechnical, civil and structural design and construction monitoring of a 44-house residential development.
LOCATION: Wairau Drive, Whangarei
CLIENT: BUPA Care Services NZ
BUPA Totara Parklands
RS Eng completed geotechnical and structural design and construction monitoring of the two-storey Community Centre and single-storey Carehome Wing, along with retaining structures to develop the site.
LOCATION: 213 Ahikiwi Road, Kaihu, Dargaville
CLIENT: Private
Kaihu Papakainga
Geotechnical and structural design and construction monitoring of earthworks, building foundations and bridges.
LOCATION: Lower Port Road, Port Whangarei
CLIENT: Northport Coolstores
Pipe Bridge
Structural engineering design and drafting of a steel truss bridge to support pipes carrying refrigerant. Works were designed and staged to maintain operation of the plant during installation.